Turnkey construction stage
Unlock, move in and enjoy life?
With the turnkey construction stage, apart from your personal furnishings and fittings, you receive a house that is more or less ready for occupation. Apart from the bare bones and ready for finishing your home incorporates the following from the upper surface of the basement.
Floorings
Ceramic tiles are laid in the porch, hallway, kitchen, bath, WC and storage room. Wood skirting is installed in those rooms fitted with floor tiles, but not wall tiling. Laminate flooring with matching skirting is laid in the living- and bedrooms. The material price class for tiles is € 22/m² and € 14.80/m² for laminate (other floorings available).Wall and ceiling surface finishing
All the joins in the interior walls and ceilings are reinforced and filled in the standard version (Q2) and are thus ready for tiling or wallpapering with woodchip wallpaper. Finer surface finishing is available at extra charge (Q3).Wall tiling
Doorframe-high wall tiling is provided in every bathroom and WC. Roof slopes are not tiled. The material price class for tiles is € 22/m² (other wall coverings are always available at extra or reduced cost).Painting & wallpapering
All the walls and ceilings (with the exception of the tiled surfaces) are covered with branded woodchip wallpaper with an emulsion paint coating. Painting of the walls and ceilings with emulsion (without wallpaper, but with a finer surface finish (Q3)) is also possible.Interior doors
Dana solid wood doors are provided with special wood veneers, metal fittings and wood frames in beech or white. Doors can be supplied with or without glazing.Sanitary installations
The supply, installation and connection of the sanitary fittings drawn on the ground plan or listed in the quotation. VILLEROY & BOCH and HANSGROHE products are already included among the standard features.Special requests
Supplementary services can be offered and supplied at the request of the client.Other construction stages:
Bare bone house
Ready for finishing house